ZRG-0.12 Steam Heating Calorifier Engineering Requirements

1.设计压力
Design pressure 0.7MPa
工作压力
Working pressure 0.6MPa
2.密性试验压力
Test Pressure of Sealing 0.8MPa
强度试验压力
Test Pressure of Strength 1.0MPa
3.各附件实际位置现场定。
Various appendices physical
location scene decides
4、主要部件材料:不锈钢
Material of main parts:Stainlness

ZRG-0.12 Steam Heating Calorifier General Drawing

ZRG-0.12 steam heating tank general drawing.jpg

NO. Code Name Material Qty. Remarks
1 LEG Q235A 1
2 Body SS304 1
3 STEAM HEATER Assembly 1
4 TEMPERTURE CONTROL VALVE Assembly 1
5 WSS-401 TEMPERTURE GUAGE Assembly 1
6 PRESSURE GUAGE(WATER) Assembly 1
7 PRESSURE GUAGE(STEAM) Assembly 1
8 NAMEPLATE SS304 1
9 A21W-16P RELIEF VALVE Assembly 1
10 THERMOSTAT Assembly 1
11 UQK-01-C LIQUID LEVEL CONTROLLER Assembly 1