ZRG-0.12 Steam Heating Calorifier
ZRG-0.12 Steam Heating Calorifier Engineering Requirements
1.设计压力
Design pressure 0.7MPa
工作压力
Working pressure 0.6MPa
2.密性试验压力
Test Pressure of Sealing 0.8MPa
强度试验压力
Test Pressure of Strength 1.0MPa
3.各附件实际位置现场定。
Various appendices physical
location scene decides
4、主要部件材料:不锈钢
Material of main parts:Stainlness
ZRG-0.12 Steam Heating Calorifier General Drawing
NO. | Code | Name | Material | Qty. | Remarks |
1 | LEG | Q235A | 1 | ||
2 | Body | SS304 | 1 | ||
3 | STEAM HEATER | Assembly | 1 | ||
4 | TEMPERTURE CONTROL VALVE | Assembly | 1 | ||
5 | WSS-401 | TEMPERTURE GUAGE | Assembly | 1 | |
6 | PRESSURE GUAGE(WATER) | Assembly | 1 | ||
7 | PRESSURE GUAGE(STEAM) | Assembly | 1 | ||
8 | NAMEPLATE | SS304 | 1 | ||
9 | A21W-16P | RELIEF VALVE | Assembly | 1 | |
10 | THERMOSTAT | Assembly | 1 | ||
11 | UQK-01-C | LIQUID LEVEL CONTROLLER | Assembly | 1 |
CONTACT WITH US NOW