J507XG  Pipe Welding Electrode

J507XG Pipe Welding Electrode

J507XG
GB:E5015
AWS:E7015
Current:Suitable for downward welding, downward fillet welding and downward butt groove welding on round pipes with thickness lower than or equal to 9mm, and also used for downward backing weld on round pipes with thickness higher than 9mm.

J507XG

According with GB E5015
Corresponding with AWS E7015


Introduction: J507XG is a kind of carbon steel electrode with low-hydrogen natrium type coating specially used for vertical downward welding on pipelines. The characteristics are that in vertical downward welding, the slags do not fall off, the arc is stable and has some spray force, and it has good slag detachability and beautiful ripples. DC. The electrode should be connected to the positive terminal. It has excellent mechanical properties and crack-resistance.


Uses: Suitable for downward welding, downward fillet welding and downward butt groove welding on round pipes with thickness lower than or equal to 9mm, and also used for downward backing weld on round pipes with thickness higher than 9mm.


Chemical Composition of Deposited Metal (%)
Chemical Composition
C
Mn
Si
S
P
Ni
Mo
Cr
V
Guarantee Value
≤0.12
0.8~1.3
≤0.75
≤0.035
≤0.040
≤0.30
≤0.30
≤0.20
≤0.08

Mechanical Properties of Deposited Metal
Test Item
Rm(MPa)
ReL或Rp0.2(Mpa)
A(%)
KV2(J)
Guarantee Value
≥490
≥400
≥22
≥27(-30℃)
General Result
520~580
≥410
24~32
50~100

Diffusible Hydrogen Content in Deposited Metal: ≤8.0ml/100g(Glycerine Hydrogen Test)

X-ray Radiographic Inspection: ⅠDegree

Reference Current (DC+)
Electrode Diameter(mm)
φ2.5
φ3.2
φ4.0
Welding Current (A)
60~100
80~130
110~150

Instructions:
1.The electrodes must be baked under about 350℃ for an hour before welding, and used as soon as baking is completed.
2.The stains on the weldments, such as rust, oil stains, moisture, etc., must be cleared away before welding.
3.It is suitable to manipulate the electrodes directly downwards or with a little downward crescent weaving, but the weaving should not be too wide.
4.Striking arc should be completed out of the groove and, when starting the manipulation of electrodes, the molten pool should be filled before the manipulation of electrodes.

CONTACT WITH US NOW

Our mail: manager@hiseamarine.com

Society certificates

Hi-Sea Group-Obtained-certification